Unremitting Self-improvement, Social Commitment
Fengkai belt conveyor project
Dump truck body
Xuzhou Tongshan District Yellow River Road through the project over the bridge
Caofeidian Coal Terminal Grid Shelf
Shanxi TISCO
Chuquicamata Project to Chile
Sierra Gorda Project to Chile
Antucoya Project to Chile
Kunming belt conveyor
Qingdao oil refining pipe conveyor
power plant pipe conveyor of Tuoketuo area in Inner Mongolia
Feng Jiata trestle
wooden trestle ferry terminal in Rizhao Port
straight line belt conveyor in Rizhao Port
bulk grain belt conveyor in Rizhao Port
tippler
Integrity Management, Quality Service, Cooperation And Win-win, And Constantly Go Beyond
Real-time Dynamic, At Any Time To Master
2017-08
11
We have finished supply of Lian Yungang steel structure project, and total weight is over 820 tons.
2016-12
13
Cone head: In the bolt ball grid in the thick pipe diameter pipe connected with the ball, in order to avoid head collision (a ball gene…
2016-12
13
Grid installation requirements1, the bolt tightened to the appropriate location, to ensure the stability of the bolt, and to ensure tha…
2016-12
13
Grid structure is composed of a number of rods in accordance with a certain form of grid nodes connected through the space structure. I…
2016-12
13
Grid structure according to the shape of the different divided into flat lattice and curved shell two categories. Now the most widely u…
2016-12
13
Conveyors should normally be started under no-load conditions. In the case of several belt conveyors installed in succession, a startin…